ACTIVITIES:
BOP electrical design and detailed engineering
Design, Engineering, Manufacturing, Assembly, Factory Testing, Packing and
Supply of “Integrated Package Substation and Local equipment Room (LER)”
for “Tawke CPF 2 – Export pump facility”.
BOP electrical design and detailed engineering Power Systems Studies including:
• Load Flow Analysis
• Short Circuit Analysis
• Motor starting Analysis
• Transient Analysis
• Protection coordination study
Detailed engineering for:
• Equipment list
• Load list
• Power Cable specification
• Cable Material take Off – MTO
• Cable tray routing
• Specification for electrical bulks
• MTO for electrical bulks
• Earthing & Lightning
• Lightning
• Typical installation drawings
• As building/close out activities
Integrated Turn Key Package Substation
N.1 Pre-fabricated Structural Buildings (Switchgear Room & Control Room), complete with
n.5 (390 sqm) Modular Container Units
• HVAC System;
• Fire detection and fire fighting system;
• Lighting & Small Power system;
Equipment:
• N.1 11kV Synchronisation Switchgear, Metal Clad type;
• N.1 3.3kV Export Pumps Switchgear, Metal Clad type;
• N.6 3.3kV MV Soft Starters for Export Pump Motors;
• N.1 400V Low Voltage Switchboard – PC/MCC type;
• 230V AC UPS – 75kVA (60kW)
• N.7 1.500kVA, 0.425/11 kV Oil filled Transformers;
• N.2 12.5MVA, 11/3.6 kV Oil filled Transformers;
• N.2 1.500kVA, 3.3/0.425 kV Oil filled Transformers;
• N.1 11 kV Earthing (ZigZag) Transformer;
• N.2 3.3 kV Neutral Earthing Resistors;
• Engineering and drawings;
• Protection coordination & setting study for digital relays in scope of supply;
• Furnishing protection relay coordination & calculation;
• Furnishing CT & VT study;
• Packing (where necessary), suitable for Track transportation